Slide Rail Systems Success Story
Single-tier 4-sided slide rail systems were chosen for the GR4 I-95 project in Philadelphia, PA. This application was a mix of 20x20x8 and 24x24x8 pits. Steel framed mats are sitting on 6x6 timbers outside of slide rail systems in order to drill piles. Micro-pile testing (anchored pile) is being performed in the pictures showing the beams.


