Slide Rail Systems Success Story
40,000 gallon diesel gas tanks were to be installed in an difficult area; dry dirt would shear off the sides of the excavation into the working pit, making conditions unsafe. Slide Rail, Linear Multiple Bay, was the best choice for this project. The dig and push system kept constant pressure against the surrounding dirt, eventually yielding the 87 feet of open space to begin installing the diesel tanks.