Slide Rail Systems Success Story
To accommodate a massive lift station, Slide Rail ClearSpan was used to shore the 60-ft. by 35-ft. pit that needed to stay open and properly shored for over 3 months. The ClearSpan system was installed in only 13 days, rather than the 30 days it would have taken to install another shoring system such as tight sheeting.